Lopez-San Juan Cable Breaks Again

1959 Cable Repair Rig

The submarine cable between Lopez and San Juan failed again. Diesel generators in Friday Harbor supplied power until the early morning of July 17, when the repaired cable again permitted the flow of energy from the mainland.